Sirte Basin · Libya · Est. 2026

Every new oil well releases gas that is usually burned off into the sky. Gas4AI captures it at the wellhead, turns it into electricity on site, and uses that power to run AI datacenters in the Libyan desert.

  1. 01Flare gas
  2. 02Power
  3. 03Compute

01 — The problem

When a well is drilled, associated gas rises with the crude. With no pipeline nearby, operators flare it. That is wasted energy, wasted revenue, and millions of tonnes of CO₂.

0 bcmof associated gas flared in Libya each year*
0 TWhof electricity that gas could generate
0 Mtof CO₂-equivalent released every year

*Approximate, based on public satellite flaring estimates (World Bank GGFR). Illustrative figures, to be refined.

02 — Capture

Instead of sending gas to the flare stack, a skid-mounted unit at the wellhead scrubs, dries and compresses it, then pipes it to power generation a few hundred metres away.

  • Skid-mounted, deployable within weeks
  • H₂S scrubbing & liquids recovery
  • Zero routine flaring at the pad

03 — Convert

Modular gas turbines and gensets turn the captured gas into steady baseload electricity. It is an off-grid microgrid that needs no national transmission lines.

0 MWper well-pad site
0.0 MMscfdof gas needed for 10 MW
0.0%target uptime with N+1 gensets

04 — Compute

Containerised, liquid-cooled AI racks sit beside the generators. Each DataServerNode trains and serves models around the clock, cooled by dry coolers that use the cold desert nights.

DataServerNode · v1
GPUs per site
~5,000
IT load
8.3 MW
PUE target
1.2
Cooling
Direct-to-chip liquid
Backhaul
Fiber + LEO satellite
Build time
< 9 months

05 — Why Libya

Libya holds Africa's largest proven oil reserves and wide stretches of open desert, and sits milliseconds from Southern Europe through Mediterranean subsea cables. The gas is already here, and so is the demand for compute.

48 bn bblproven oil reserves, #1 in Africa
3 basinsSirte, Ghadames & Murzuq target zones
~20 mslatency to Southern Europe (est.)
Mediterranean SeaSirte BasinGhadames BasinMurzuq BasinTripoliBenghazi

Candidate zones (illustrative)

06 — Roadmap

  1. 2027

    Pilot

    One well pad, 5 MW, first AI cluster online.

  2. 2028

    Cluster

    10 sites across the Sirte Basin, 100 MW.

  3. 2030

    Grid

    500 MW+ of flare-powered compute, linked by fiber.

07 — Join us

We partner with operators, investors and AI companies. Bring a well, capital, or demand for compute.

GAS4AI
Igniting the desert000